1. Immobile thermal shock test, quickly realize temperature conversion
2. Conversion time 8 seconds
3. Temperature recovery time within 5 minutes
4. Adopt a 7.5-inch color screen control system, set cycle and defrost times, display instructions for abnormal and fault points, and have a troubleshooting alarm device
5. The refrigeration system adopts ice-water cooling method, which can closely cooperate with the factory's ice-water system and rationally utilize existing resources.